The building of
the lakeside cottage was
completed by fall but
the path curving
through brush and cottonwood
to the seawall was
traced in winter’s snow
stamped out and left until
crushed limestone could be
dumped and spread in
spring as the snow
melted though on the
lake the ice still lay
three
feet
thick